This tool helps to estimate the impact of new coating technology developed in the project/ It estimates the cost of energy by using the Levelised Cost of Energy (LCOE) metric.
Please select type of plant (e.g. Double-flash):
Please specify analysis scenario:
Please specify installation data:
Please specify maintenance data (e.g. Pipes: 25% replacement in 15 years):
Preventive maintenance: Every 5th year for 21 days
Please specify permitting data:
General Project Variables:
Pre-Operation Discount Rates:
Project Schedule & Durations:
Please specify exploration data:
Exploration- Pre-Drilling Costs :
Exploration - Drilling Costs :
Exploration Drilling at Developed Site :
Leasing Cost:
Please specify desired coating thickness:
Please specify material cost contribution:
Surface Equipment Costs
Geothermal Pumping Costs:
Well Field Details:
Drilling Costs :
Well Cost Estimates:
Stimulation Costs:
Other Costs:
Well Flow Rate
Hydraulic Drawdown
Thermal Drawdown
Makeup Water
Operations & Maintenance
Water cost:
Transmission Cost:
BINARY POWER PLANT:
FLASH STEAM POWER PLANT:
Flash Plant Parameters:
Please wait this might take a while